
Home Remodeling & Renovation
Kitchens, bathrooms, additions and whole-home renovation, tailored to how you actually live.
- Kitchen & bathroom remodeling
- Room additions
- Cabinets, countertops, flooring
- Escrow repairs

General contracting, remodeling, commercial and industrial construction and licensed demolition — delivered by one family owned company with one standard of work.
Core Divisions
Patterson & Sons Construction Inc. covers a complete and diverse spectrum of construction services — from a residential kitchen through to industrial demolition. Each division is run by the same people, to the same standard.

Kitchens, bathrooms, additions and whole-home renovation, tailored to how you actually live.

New build, renovation, fit-out and reactive maintenance for commercial and retail property.

Specialised industrial work: build-outs, mezzanines, equipment set and occupied renovation.

Licensed demolition, from a single wall to a full structure — hauled out and left clean.
Trades & Capabilities
The trades below are part of the everyday scope of work at PSC. Where a project calls for a speciality we don’t self-perform, we bring in a vetted subcontractor and stay accountable for their work as if it were ours.
Full-scope general contracting with PSC as the single point of accountability, coordinating every trade on the job.
Repair, re-roof and replacement, tied into the rest of the envelope so the fix actually stops the leak.
Service, rewires, panels, fixtures and the rough-in that supports a remodel or a build-out.
Driveways, slabs, footings, walkways and block wall — formed, poured and finished properly.
Fast response, controlled dry-out and the reconstruction that follows, all under one contract.
Changeouts and replacement units sized to the space rather than to whatever was there before.
Hang, tape, texture and finish — interior and exterior, prepped to a standard that lasts.
Cabinetry, stone and solid-surface countertops, templated and installed to fit the room as built.
Landlord and tenant-side TI work: demising walls, ceilings, flooring, power and permit coordination.
How We Work
Thorough for us, simple for you. It is how we manage expectations and prevent the misunderstandings that turn a build into an argument.
We start by listening. We walk the site with you, gather your requirements and get clear on the scale, the constraints and what “done” looks like before anyone quotes a number.
With the requirements understood we develop the scope and prepare a detailed, itemised estimate — timeline, cost and a written description of work, so there is nothing left to interpretation.
On approval we submit the final plan and proceed to design. Where you have asked for options we lay out the possibilities and the selections available for the space, with our recommendation.
Materials are ordered and the work goes in. We coordinate every phase with you and keep one point of contact, so you always know who to call and what happens next.

No Job Too Big Or Small
Each client arrives with their own problem, and our job is to solve it in a way that suits their needs rather than our convenience. We take the time to get into the problem and put real, effective options on the table that can be weighed against each other.
We prefer to be proactive rather than reactive. We value your time as much as our own, which in practice means turning up when we said we would, telling you early when something changes, and finishing the punch list instead of disappearing at ninety percent.
Describe the job and we’ll tell you straight — including when it isn’t a job we should be doing for you.